Delaware Energy Monitor is a nonpartisan publication covering the state’s energy system and infrastructure. We explain complex decisions through official records, utility filings, public documents and clearly attributed reporting. We do not endorse a particular fuel, company or policy outcome.
How we work
Coverage is nonpartisan. We describe the text, implementation and documented effects of energy policies without using party affiliation as a substitute for analysis.
- Primary records first. Statutes, bill pages, agency decisions, utility filings, official reports and public notices are preferred over commentary.
- Status labels matter. Proposed, paused, denied under a specific design, approved, under construction and operating are different states.
- Unknown means unknown. Missing capacity, water use, investment or schedule figures are not filled with guesses.
- Context is not advocacy. We describe potential economic benefits and public costs without assuming that every project is good or bad.
- Dates are attached to claims. Laws, rates, market conditions and projects change; each time-sensitive item carries a review date.
Source hierarchy
- Primary law and official records: Delaware Code, General Assembly bill detail and session law, PSC dockets, FERC filings, PJM documents, DNREC notices and orders, county land-use applications and meeting records.
- Utility and cooperative documents: tariffs, integrated resource plans, capital plans, rate filings, service-territory maps, annual reports and member information.
- Independent reporting: used to add context or document developments not yet reflected in accessible primary records. Reporting is labeled and linked.
- Third-party databases: used as leads, not conclusive evidence, unless the underlying documents are verified.
Project-record methodology
Project entries require an identifiable name or description and a documentary basis. The register records the source date, the latest reviewed date, location as specifically as the source allows, applicant or developer only where identified, and project status supported by the record.
Power demand is included only when a utility filing, permit, developer statement or other identifiable source reports it. We distinguish a developer’s stated figure from an independently verified connected load. A missing figure remains blank.
Where reports differ, the underlying agency filing or final order takes precedence for legal status. A later reported withdrawal or pause is included as a subsequent event, not as a substitute for the order.
Definitions used on this site
MW (megawatt): a unit of instantaneous power capacity or demand. It does not measure total energy consumed over time.
MWh (megawatt-hour): a unit of energy. One MW sustained for one hour equals one MWh.
Load factor: average demand divided by peak demand over a specified period.
Transmission: high-voltage movement of bulk electricity across a regional network.
Distribution: local delivery through substations, feeders, poles, wires and transformers.
Interconnection: the technical and regulatory process for connecting a generating resource or load to the grid.
Large energy use facility: the statutory term defined in Delaware law; see the threshold explainer.
Publisher disclosure
Delaware Energy Monitor is published separately by Market Limits. The publisher relationship is disclosed; editorial coverage is maintained independently. The publication is not an official government or utility resource.
We do not accept payment to alter project statuses, suppress findings or change legal summaries. Corrections should identify the claim, the relevant source and the proposed correction.
Review dates and corrections
This version was reviewed through November 6, 2026. Pages are not updated in real time. Before relying on a deadline, tariff, rate or legal requirement, open the linked official record and confirm its current version. Corrections and documentary additions should identify the precise claim and supporting evidence.
For corrections or documentary additions, use the public contact method on the publication’s associated publisher site. Corrections should be dated and reflected transparently in the relevant page.
Core primary-source library
- Exploring the Data Center Industry in the United States: Identified Impacts & Public Policy Considerations (January 2026)Delaware Division of Legislative Services · January 2026
- Title 30, § 2010 — definitions, including large energy use facilityDelaware Code Online · Current code
- Title 26, § 203G — electric service agreements for large energy use facilitiesDelaware Code Online · Current code
- Title 26, § 317 — rates for large energy use facilitiesDelaware Code Online · Current code
- Title 29, § 8066 — large energy use facilitiesDelaware Code Online · Current code
- HS 1 for HB 233 — bill detail and signed statusDelaware General Assembly · Signed August 26, 2026
- HB 445 — bill detail and signed statusDelaware General Assembly · Signed August 26, 2026
- SB 312 — bill detail and signed statusDelaware General Assembly · Signed August 26, 2026
- HB 310 — business tax credits and deductionsDelaware General Assembly · Signed August 26, 2026
- SB 326 — bill detail and signed statusDelaware General Assembly · Signed July 13, 2026
- SB 353 — proposed data-center moratorium (not enacted)Delaware General Assembly · 2026 session
- Analysis of Delaware’s Electricity Distribution GridDNREC State Energy Office · Final report submitted July 30, 2026
- Member municipal utilitiesDelaware Municipal Electric Corporation · Current member list
- About the cooperative and service territoryDelaware Electric Cooperative · Current website
- What PJM doesPJM Interconnection · Current website
- Starwood Digital Ventures — CZA status decision public noticeDNREC · February 4, 2026
- CZ-2026-01 — Decision and Final Order (PDF)DNREC Coastal Zone Industrial Control Board · April 17, 2026
- Delmarva Power Appeals PSC Decision on Interim RatesDivision of the Public Advocate · September 16, 2026
- 2026 Delmarva Power Interim Rate Increase ImplementationDelaware Public Service Commission · July 10, 2026
- Title 29, § 8066 — Large energy use facilitiesDelaware Code Online · Current statute
Nuclear and Indian River reference library
- SCR 18 — Delaware Nuclear Energy Feasibility Task ForceDelaware General Assembly · Passed July 1, 2025
- SCR 129 — extending the Nuclear Energy Feasibility Task ForceDelaware General Assembly · Passed January 28, 2026
- Nuclear Energy Feasibility Task Force — official recordDelaware General Assembly · Final report received July 27, 2026
- Climate Action Plan — electricity generation and emerging technologiesDNREC · Current strategy page
- Delaware state profile and nuclear facility statusU.S. Nuclear Regulatory Commission · State profile
- Delaware State Energy ProfileU.S. Energy Information Administration · Current state profile
- 2024 Delaware State Infrastructure ReportPJM Interconnection · Published June 2025
- Delaware Generator to Retire Ahead of SchedulePJM Interconnection · December 23, 2024
- 2025 Form 10-K — Indian River reliability-must-run proceedingNRG Energy — SEC filing · Filed 2026
Independent reporting and commentary cited
- Project Washington pulls appeal; project will not move forward under current plansSpotlight Delaware · August 28, 2026
- County Councilman says Newark data center plan paused after dealSpotlight Delaware · July 2, 2026
- Two New Castle County industrial projects may become data centersSpotlight Delaware · December 16, 2025
- Could the Indian River power plant be restarted?Spotlight Delaware · April 3, 2026
- Indian River power plant revival talks underwayCoastTV · February 16, 2026
- Indian River Power Plant Closes After 68 Years of OperationWBOC · February 24, 2025
- End of the line for coal trains on DelmarvaWBOC · December 31, 2025
- Task force report: local government input needed as First State weighs future of nuclear energyDelaware Public Media · August 12, 2026
- Task Force Releases Report Examining Possible Development of Nuclear Power in DelawareAmerican Public Power Association · August 25, 2026
- Task Force Fell Far Short of What Needed to be Done to Secure Delaware’s FutureDelaware House Republicans — Opinion · August 28, 2026 · Opinion
Energy profile and generation sources
- Delaware State Energy OverviewU.S. Energy Information Administration · End-use consumption and 2025 generation estimates
- Delaware Electricity ProfileU.S. Energy Information Administration · Capacity, generation, sales and prices
- Renewable Energy Portfolio StandardsDNREC · RPS targets and credit-compliance framework
- Delaware Energy ProfileDNREC State Energy Office · Statewide energy-system overview
- Offshore EnergyDNREC · Coastal energy and offshore wind resources
Current projects and policy developments
Rates, utility cases and consumer protections
- 2026 Delmarva Power Interim Rate Increase ImplementationPublic Service Commission · July 10, 2026
- Your Electric Bill, Your Voice: What Delaware Ratepayers Need to KnowDivision of the Public Advocate · August 17, 2026
- Delmarva Power Appeals PSC Decision on Interim RatesDivision of the Public Advocate · September 16, 2026
- HB 308 — public access to PSC meetingsDelaware General Assembly · Signed August 26, 2026
- HB 310 — business tax credits and deductionsDelaware General Assembly · Signed August 26, 2026
- Title 29, § 8066 — Large energy use facilitiesDelaware Code Online · Current statute
- Aternium $380 million hydrogen and heavy-water facility accepted into JobsFirstGovernor’s Office · October 30, 2026 · Project remains in planning; approvals not yet begun
- HB 308 — public access to PSC meetingsDelaware General Assembly · Signed August 26, 2026
- HS 1 for HB 233Delaware General Assembly · Signed August 26, 2026
- HB 445Delaware General Assembly · Signed August 26, 2026
- SB 312Delaware General Assembly · Signed August 26, 2026
- SB 326Delaware General Assembly · Signed July 13, 2026